Case Study

Reducing Blowdown Time While Maintaining Process Control

Custom vertical vent silencer with a rain cap, mounted on legs among tall blue process tanks and insulated piping at an industrial plant.

Customer Challenge:

In precision foam manufacturing, autoclave blowdown time directly influences product quality and production throughout. Existing vent systems limited blowdown cycles to approximately 20 minutes, restricting capacity and reducing operational efficiency. The customer required a solution that would reduce cycle time to 6 minutes without compromising safety, noise limits or product consistency.

Solution:

Burgess-Manning engineered custom vent silencers tailored to the customer’s autoclave process requirements:

  • Optimized silencer backpressure to support controlled blowdown
  • Integrated with valve and process conditions
  • Designed to meet acoustic limits while enabling faster pressure relief
  • Engineered for repeatable, consistent performance

Outcome:

At the referenced Zotefoams installation, the commissioned vent-silencer arrangement achieved an approximately six-minute blowdown cycle under the agreed operating conditions, compared with approximately 20 minutes for the previous arrangement.

Developed collaboratively by the Zotefoams and Burgess-Manning engineering teams, the project supported the facility’s target depressurization time while maintaining the required process-control and product-quality parameters. These results are specific to the referenced installation, procecss conditions and operating configuration.